Complete workflow from tenant call intake through task closure. Aligned with 3PM Property Management Agreement, Emergency Contractor Agreement, BC Residential Tenancy Act, and Buildium best practices.
- Triage First: 3PM never auto-schedules vendors. Always contact tenant for details first.
- Collect Evidence: Request photos, videos, and detailed information before vendor dispatch.
- Self-Resolution Check: Assess if tenant can resolve (e.g., drain cleaner for clog).
- RTA Responsibility: Determine if it's landlord or tenant repair duty per BC law.
- Tenant Secrecy: Never tell tenant if their issue is "emergency"βonly that it's logged.
Tenant calls the maintenance line. If office hours (Mon-Fri, 8am-5pm): call rings to 3PM staff first. After 3 rings, rolls to MCC. If after hours: goes directly to MCC. MCC collects information and logs into Buildium.
Staff contacts tenant within 2 business hours to gather detailed information. Ask triage questions, request photos/videos, assess if emergency, determine RTA responsibility, and estimate cost.
- What exactly is the problem?
- When did it start?
- Is it getting worse?
- Any safety concerns? (water, electrical, gas, structural)
- What room/area affected?
- Appliance: Make/Model/Serial #?
- When available for vendor access?
- Have you tried anything to fix it?
- Photos of the issue (all angles)
- Videos (if issue is intermittent)
- Photos of appliance model/serial plate
- Any warranty documentation
- Clogged drain (use drain cleaner, remove hair)
- Tripped circuit breaker (reset it)
- Garbage disposal jammed (use reset button)
- Running toilet (adjust flapper chain)
- Furnace not working (check thermostat batteries/filter)
- Smoke detector chirping (replace battery)
| Landlord Responsibility | Tenant Responsibility |
|---|---|
| Normal wear & tear | Damage from tenant misuse |
| Building systems (plumbing, electrical, HVAC) | Items tenant brought into unit |
| Structural issues | Damage by tenant's guests |
| Included appliances | Tenant neglect/misuse |
Document determination with RTA reference in Buildium messages.
Contact 2-3 approved vendors from Buildium list. Send all evidence and request detailed written quotes. Set 24-48 hour deadline.
- Detailed scope of work
- Materials list + costs
- Labour costs
- GST (5%)
- Timeline for completion
- Warranty terms
Compare vendor quotes and select best option. Determine approval pathway based on $500 threshold and emergency status.
| Scenario | Cost | Emergency? | Action Required |
|---|---|---|---|
| Non-Emerg <$500 | < $500 | No | Notify Owner (72 hrs) No approval needed. If no response β proceed per PMA. |
| Non-Emerg β₯$500 | β₯ $500 | No | GET WRITTEN APPROVAL 24 hr response required. Escalate at 36 hrs. |
| Emerg <$500 | < $500 | Yes | DISPATCH IMMEDIATELY No approval needed. Notify owner after. |
| Emerg β₯$500 | β₯ $500 | Yes | STOP-LOSS PROTOCOL Attempt live approval. If unreachable β proceed, invoice owner. |
After approval, create Buildium Work Order. Link to task, assign vendor, provide all details. Schedule with tenant (24-hour RTA notice). Notify owner within 2 hours.
- Owner notification: Buildium task + Email with dispatch confirmation
- Tenant confirmation: Buildium message with scheduled date/time/vendor ETA
- Vendor: Work order with all details, access instructions, tenant phone
Vendor completes work, uploads documentation to Buildium. Staff verifies quality and completeness. Contact tenant for satisfaction confirmation.
- Before photos (all affected areas)
- After photos (completed work)
- Completion report (work performed, materials, issues found)
- Invoice (matching approved quote)
- Warranty documentation (if applicable)
- All required photos uploaded
- Invoice matches approved quote (flag discrepancies)
- Scope completed per work order
- Quality acceptable
- Area cleaned up
Contact tenant within 48 hours:
- Is the issue completely resolved?
- Are you satisfied with the quality?
- Did vendor clean up?
- Was vendor professional?
- Any remaining concerns?
Assign task to Accounting. Accounting verifies invoice matches quote, processes payment within 7 days, and reconciles to owner account.
- Invoice matches approved quote (no unapproved additions)
- GST calculated correctly (5%)
- Vendor banking info on file
- Work order reference included on invoice
- Create Buildium Bill
- Issue payment (EFT preferred, cheque if necessary)
- Confirm vendor received payment
- Reconcile expense to owner account in Buildium
Verify all required documentation is complete. Confirm compliance with PMA, Emergency Agreement, and RTA. Close task and archive per 7-year record retention policy.
Repair Authority (Clause 11):
- 3PM can approve repairs <$500 without owner approval (notify only)
- Repairs β₯$500 require written owner approval
- Emergency repairs <$500 can proceed without approval (inform owner after)
Communication Policy:
- Buildium = official record (all updates logged)
- Email = legal record (approvals, quotes, decisions)
- Text/WeChat/Phone = escalation only
Response Times:
- Initial acknowledgment: 2 business hours
- Owner approval (<$500 non-emergency): 72 hours
- Owner approval (β₯$500): 24 hours (escalate at 36 hours)
- Dispatch notification to owner: Within 2 hours
- Vendor payment: Within 7 days of invoice
- Emergency work <$500: Proceed immediately, no approval needed
- Emergency work β₯$500: Attempt live owner approval; if unreachable, proceed with stop-loss to prevent damage
- All vendors must respond to automated MEDS calls (3 attempts max)
- Unauthorized work not compensated
- Vendors must maintain $2M liability insurance
- All work must be in writing (work order required)
- Landlord must provide 24-hour written notice before entry (unless emergency or tenant waives)
- Landlord responsible for repair of: building systems, structural issues, normal wear & tear
- Tenant responsible for: damage from misuse, items they brought in, negligence
- Repair timeline: "reasonable" time (typically 7-14 days for non-emergency)
- Emergency issues (no heat, water, fire hazard) may require <24 hour response
- Always acknowledge receipt within 2 hours (Buildium message or phone call)
- Provide realistic ETA for vendor contact
- Confirm RTA 24-hour notice before vendor entry
- Update tenant if delays occur
- Confirm satisfaction after completion
- MCC logs all calls into Buildium as tasks (not work orders yet)
- MCC Emergency Dispatch (MEDS) system handles after-hours emergency dispatch
- MCC creates HIGH priority tasks for emergencies, NORMAL for non-emergencies
- Emails sent to PM upon task creation and upon vendor acceptance
- SMS/text sent to emergency vendor list with auto-call + accept link
- 3PM staff must triage non-emergencies before vendor dispatch (no auto-schedule)
The $500 threshold determines whether owner approval is required before work begins. This is set by the 3PM Property Management Agreement and Emergency Contractor Agreement. All decisions flow from this single number.
| Detail | Value |
|---|---|
| Approval Required? | NO β Notify owner only |
| Owner Response Window | 72 hours (can proceed if no response) |
| Who Decides Vendor? | 3PM (after triage & quotes) |
| Communication Method | Buildium + Email |
| Legal Basis | PMA Clause 11 (repair authority) |
| Detail | Value |
|---|---|
| Approval Required? | YES β Written approval MANDATORY |
| Owner Response Window | 24 hours (escalate at 36 hrs, escalate to Senior PM at 48 hrs) |
| Escalation if No Response | Call + WeChat/WhatsApp β Senior PM β Stop-loss (if RTA-urgent) |
| Communication Method | Buildium + Email (email required), then Phone, then social media |
| Valid Approval? | Email "APPROVED" or "Yes" = legal binding approval. Save screenshot in attachments. |
| Never Proceed If: | Owner has not replied "APPROVED"βNO EXCEPTIONS |
| Detail | Value |
|---|---|
| Approval Required? | NO β Proceed immediately per Emergency Contractor Agreement |
| Who Dispatches? | MCC MEDS system (automated) OR 3PM staff (if after hours non-MCC) |
| Owner Notification | AFTER work dispatched (information only, not approval request) |
| Cost Responsibility | Can be tenant or landlord (determine RTA responsibility later) |
| Legal Basis | Emergency Contractor Agreement Section 5 |
| Detail | Value |
|---|---|
| Approval Required? | ATTEMPT live approval, but NOT required if unreachable |
| Contact Attempt Method | Phone β Email (simultaneous) β WeChat/SMS (if needed) |
| If Owner Unreachable | PROCEED with work to prevent further damage (stop-loss protocol) |
| Document Everything | All contact attempts with times, reasons for stop-loss decision |
| Invoice Owner | Owner billed for stop-loss work per PMA emergency clause |
| Legal Basis | PMA emergency provision + Emergency Contractor Agreement |
These issues automatically justify stop-loss protocol even if β₯$500:
- Active flooding / water damage β Stop water source immediately
- Structural danger β Collapse risk, falling debris
- No heat β Below freezing temperature threatens pipes/life safety
- Fire hazard β Electrical fire risk, gas leak
- Sewage backup β Health hazard, biohazard
- Elevator entrapment β Person trapped